
The second reference instrument, a seismic land station, was deployed on 22/07/2026.
It was installed inside the Praia Formosa Cable Landing Station, where the GeoLab cable begins.
The station name is NEKAPI, following the suggestions from the 5G class s/tudents.
This is another milestone for project ECHO.